With capacity of 8,212 megawatts (MW), the plant has been offline since 2012 after the Fukushima disaster a year earlier led to the shutdown of all nuclear power plants in Japan at the time. In 2021, the Nuclear Regulation Authority (NRA) barred Tepco from operating Kashiwazaki-Kariwa, its only operable atomic power station, due to safety breaches including the failure to protect nuclear materials and missteps that saw an unauthorised staff member accessing sensitive areas of the plant.
Read more of this story at Slashdot.
SOCIAL SHARE CARD GENERATOR